WHEN did we move?
We moved across to our new clinic on Monday 22nd January 2024.
WHERE have we moved to? – Our own place!
Unit 19 Athena Court, Athena Drive, Tachbrook Park, Leamington Spa, Warwick. CV34 6RT. Situated behind the Leamington Spa Shires Retail Park (Off Apollo Way).

WHY have we moved?
We have loved working from our current clinic in Kenilworth for almost 6 years and will miss our work acquaintances greatly. However, we needed to find premises (predominently) on the ground floor and with allocated parking outside.

There are 10 reasons why this move will help serve our clients better in the following areas:
1). Ground floor access – Wheelchair and pram friendly throughout the clinic.
2). Private allocated parking space directly outside our clinic, including 3 Disabled/Parent-child wider spaces.
3). Easier access to the clinic from outside.
This will be particularly helpful for clients in the early stages of post partum recovery and/or following a Caesarean Section when walking any distance may be uncomfortable.
Also features a rain canopy over the front door.
View from our reception window.

4). Gender Neutral & Disabled/wheelchair friendly Toilet/WC.
5). Baby changing area within the toilet/WC.
6). Improved travel access (from outside the local area) – 5 Mins drive from M40 Motorway Junction
7). Bespoke treatment area for surgical appointments with non-touch handwashing facilities throughout the clinic.
8). Comfortable breast and bottle feeding seating area
9). Bespoke Craniosacral Therapy treatment area.
10). Quiet private location (Away from noisy high street traffic)
OUR NEW PLACE NOW.
.
.
.
.
. 
WHAT DID IT LOOK LIKE AS WE MADE IT OUR OWN
- Follow us on Facebook
Here was our blank canvas, transformations began on 6th December 2023.




- Marking up ready for work to begin


- Phase 1 – Construction of the stud walls to create Reception area, Surgical area and enclosed kitchen.

- Phase 2 – First fix of plumbing and electrics

- Phase 3 – Boarding the stud walls



- Phase 4 – Plastering



- Phase 5 – Safety Flooring in

- Phase 6 – Painting the walls, fitting units, sinks, taps, hand towel holders, soap dispensers.



- Final Phase of building work:
Reception Building work done, now waiting for furniture and blinds to arrive.

Surical area completed, now just finishing touches

Craniosacral Therapy area starting to take shape. Waiting for room divider, some pieces of furniture and new blinds.

- Signage for the Outside of the Unit


- Signage on two allocated parking spaces


New update 13th Jan 2024.
- New tiling


- CST area looking more cosy.



- Reception taking shape.

WE ARE NOW OPEN